CHAPTER 05 / 06

Roasting Case Study: Ethiopia (Natural / Medium-Light Roast)

On this page

This document is an empirical log recording the roasting of an Ethiopian dry-processed (natural) green coffee to a medium-light roast, executed in accordance with the Standard Process Guide.

  • Roast Date: August 22, 2026

Batch Specifications (Step 0)

Parameter Set / Measured Value Notes
Coffee Origin / Lot Ethiopia Sidama Baturo (2024/2025) -
Variety 74158 -
Processing Method Natural (Dry Process) -
Input Green Bean Weight 144.0g Standard unit (1kg bag divided into 7 batches)
Washing Water Temp 50°C (Purified water) Chaff and floater culling
Soaking Solution 50°C water + 15g honey + 20g fructose 30-minute soak
Post-Soak Bean Weight 183.3g Measured after removing 2.0g of defective floaters
Initial Bean Temp 30.2°C Infrared reading immediately before roasting
Initial Bed Volume 275ml Visual cylinder reading
Total Weight (incl. container) 452.3g -

Profile Projection
With a post-soak weight of 183.3g (low 180g range), this lot exhibits high cell density and relatively low water absorption. Thermal transmission is anticipated to be rapid, meaning roast progression will likely accelerate. Care must be taken to avoid excessive thermal input leading to over-roasting.
Furthermore, this variety frequently displays a rate-of-rise deceleration following the onset of first crack; adequate thermal momentum must be preserved when entering first crack.


Detailed Roasting Operations

Steps 1–2: Setup

Attach the lid to the container and position the cylinder vertically on top of the wooden chopsticks centered on the microwave floor.

Step 3: Initial Uniform Preheating (300W)

No. Power Exposure Agitation Interval Volume Trend Operational Notes
1 300W 60s 21s 275ml Preheating initiated
2 300W 60s 23s 300ml- Slight volume increase from vaporizing internal moisture
3 300W 60s 24s 275ml Minor packing fluctuation during agitation
4 300W 60s 49s 275ml Interval extended for intermediate weighing
  • Step 3 Cumulative Heat Input: 72k Ws (300W × 60s × 4 sets)
  • Step 4 Pre-check Metrics: Outer wall temp 91.7°C / Total weight 449.2g (Moisture loss: 3.1g)
  • Assessment: Exceeding 91°C with >3.0g of moisture evaporated by Set 4 confirms highly efficient heat absorption. A fast profile terminating around 24 total steps was selected.

Step 4: Primary Heating (High + Medium Alternating)

Accelerate moisture evaporation. The lid is burped (opened and snapped shut for <1s) during each agitation interval.

No. Power Exposure Agitation Interval Volume Trend Operational Notes
5 800W 30s 29s 300ml Rapid temperature rise
6 500W 50s 32s 300ml Thermal energy accumulation
7 800W 30s 29s 275–300ml Shrinkage begins as moisture vents
8 600W 40s 30s 275ml Initial light-tan coloring observed. 800W discontinued
  • Step 4 Interval Heat: 97k Ws / Cumulative Total: 169k Ws

Step 5: Steady-State Heating (Uniform Conduction via Medium Power)

To prevent premature scorching of natural sugars, 500W × 50s was bypassed in favor of 600W × 40s as the standard cycle.

No. Power Exposure Agitation Interval Volume Trend Operational Notes
9 600W 40s 23s 275ml Progressive drying
10 600W 40s 27s 250–275ml Coloring advances (mottled yellow-brown)
11 600W 40s 29s 250–275ml Transition from yellow to pale brown
12 600W 40s 26s 250ml+ Maximum shrinkage phase
13 600W 40s 24s 250ml+ Isolated, faint preliminary snap
14 600W 40s 31s 275ml- Re-expansion turning point confirmed
  • Step 5 Interval Heat: 144k Ws / Cumulative Total: 313k Ws

Step 6: Thermal Adjustment Prior to First Crack

An additional set of 600W × 30s was introduced to prevent stalling upon entering first crack.

No. Power Exposure Agitation Interval Volume Trend Operational Notes
15 600W 30s 29s 275ml+ Steady pre-crack expansion confirmed
  • Step 6 Interval Heat: 18k Ws / Cumulative Total: 331k Ws

Step 7: Driving First Crack (800W Boost)

No. Power Exposure Agitation Interval Volume Trend Operational Notes
16 800W 20s 28s 275ml+ Quiet
17 600W 20s 29s 275ml+ Latent heat absorption
18 800W 20s 32s 300ml- First crack commences (audible pops, expansion)
19 600W 20s 29s 300ml+ First crack fully develops
  • Because first crack developed with strong momentum, 800W bursts were terminated to prevent overshoot.
  • Step 7 Interval Heat: 56k Ws / Cumulative Total: 387k Ws

Step 8: Finishing & Termination Evaluation

No. Power Exposure Agitation Interval Volume Trend Operational Notes
20 600W 20s 29s 300–325ml First crack tapers off
21 600W 15s 24s 325ml Calibration phase
22 600W 15s 24s 325ml+ Crease smoothing progressing well
23 600W 15s 25s 325ml+ Subtle indicators of second crack approaching
24 600W 10s 25s - Roast terminated (Target: Medium-Light)
  • Step 8 Interval Heat: 45k Ws / Cumulative Total: 432k Ws

Step 9: Discharge and Rapid Cooling

Discharged immediately onto the cooling tray; measured bean temperature and commenced forced air cooling.

  • Discharge Bean Temperature: 215.0°C
  • Total Post-Roast Weight: 119.2g (Net yield after 1.2g defect culling: 118.0g)
Ethiopian coffee in the case study
Ethiopian coffee in the case study

Roast Summary

Evaluation Metric Measured Value
Total Steps 24 steps
Net Microwave Exposure Time 13 min 35 sec
Total Elapsed Time (incl. agitation) 24 min 20 sec
Discharge Bean Temperature 215.0°C
Finished Bean Weight 119.2g (82.8% of dry green weight)
Total Cumulative Energy 432k Ws
Time-Normalized Equivalent Energy 1065.21 kW/h
Ethiopia Shidama Baturo roast profile chart, 22 August 2026
Ethiopia Shidama Baturo roast profile chart, 22 August 2026

Technical Analysis

Completing in 24 steps with a cumulative energy input of 432k Ws and a final drop temperature of 215.0°C exemplifies the ideal profile for an Ethiopian natural medium-light roast (retaining vibrant floral volatiles while avoiding astringent underdeveloped notes or excessive bitterness).

The time-normalized energy metric of 1065.21 kW/h demonstrates exceptional agreement with the empirical baseline benchmark (approx. 1,060 kW/h) established for 144g pre-hydrated green coffee batches.